Insulation and energy-saving testing of bonding materials

Material Analysis 百检检测 2024-01-04

Report Qualification: CNAS、 CMA、 CAL

Report Style: Both Chinese and English

Report Period: Regular 3-7 working days、 except for special sample projects.

The third-party testing institutions of Baijia.net mainly engage in testing products related to the textile、 insulation、 cosmetics、 food、 and hardware industries、 as well as providing product certification services. At the same time、 they are also expanding the scope of the testing industry. Reports issued by laboratories can be stamped with CNAS/CMA/CAL qualification seals、 and the reports are true and effective

Test items:

Tensile bonding strength、 compressive strength、 flexural strength、 setting time、 tensile bonding strength with mortar、 tensile bonding strength with ceramic tiles、 mixed state、 workability、 drying time、 flexibility、 container state、 workability、 drying time、 bonding strength、 low-temperature storage stability、 water resistance、 flexibility、 container state、 workability、 drying time、 bonding strength Low temperature storage stability、 tensile bonding strength、 operable time、 compressive shear adhesive original strength、 container state、 workability、 drying time、 tensile bonding strength、 low-temperature storage stability、 flexibility、 water resistance、 drying time、 tensile bonding strength、 flexibility、 water resistance、 bonding strength、 water resistance、 flexibility、 tensile bonding strength、 lateral deformation、 tensile bonding strength、 operable time、 tensile bonding strength with mortar Tensile bonding strength、 flexibility、 tensile bonding strength、 water resistance tensile bonding strength、 bonding strength、 flexibility、 water resistance、 container state、 workability、 drying time、 bonding strength、 low-temperature storage stability、 water resistance、 alkali resistance、 putty film flexibility、 bonding strength、 bonding strength、 water resistance、 putty film flexibility、 tensile bonding strength、 water resistance tensile bonding strength、 operability time、 tensile bonding strength Water resistant tensile bonding strength、 tensile bonding strength with a drying time of 20 minutes、 lateral deformation、 original tensile bonding strength、 tensile bonding strength after immersion in water、 drying time、 lateral deformation、 tensile bonding strength、 compressive strength、 operable time

Test report function:

1. Project bidding: issue a third-party CMA/CNAS qualification report 2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: Provide authentic and effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific、 fair、 and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Test standards:

1. JG 149-2003 Expanded polystyrene board thin plastering external wall thermal insulation system/

2. DG/TJ08-2126-2013 Technical Specification for Application of Rock Wool Board Thin Plastering External Wall Thermal Insulation System/

3. JG/T469-2015 Technical Requirements for Materials of foam Glass External Wall Thermal Insulation System/

4. GB 50404-2007 Technical Specification for Rigid Foam Polyurethane Thermal Insulation and Waterproofing Engineering/

5 GB/T 29906-2013 Molded Polystyrene Board Thin Plastered External Wall Thermal Insulation System Materials/

6. DB31/T 366-2006 Technical Requirements for External Wall Thermal Insulation Mortar/

7. JC/T 1025-2007 Adhesive Gypsum/

8. JG/T 157-2009 Putty for Building External Walls/

9. JG/T 229-2007 Flexible Water Resistant Putty for External Wall Thermal Insulation/

10. DGJ08-113-2009 Code for Acceptance of Construction Quality of Building Energy Conservation Engineering/

11 GB/T 30595-2014 Extruded Polystyrene Board XPS Thin Plastered External Wall Insulation System Materials/

12. DG/TJ08-2138-2014 Technical Specification for Application of Foamed Cement Board Insulation System/

13. JG/T 298-2010 Building Interior Putty/

14. JG/T 287-2013 Insulation and Decorative Board External Wall Insulation System Materials/

15. GB/T 13480-2014 Test Method for Compressive Performance of Mineral Cotton Products/

16 DG/TJ08-2122-2013 Technical Specification for Application of Thermal Insulation and Decorative Composite Panel Wall Thermal Insulation System/

17、 JG/T 158-2013 Glue Powder Polystyrene Granule External Wall Thermal Insulation System Materials/

18、 GB/T 23455-2009 Flexible Putty for External Wall/

19、 JG/T 469-2015 Technical Requirements for Materials of foam Glass External Wall Thermal Insulation System/

20、 DG/TJ08-2088-2011 Technical Specification for Application of Inorganic Thermal Insulation Mortar System/

Inspection Process:

1 inspection customer service confirms the testing needs (samples、 projects、 report purposes、 etc.)

2. Arrange for corresponding engineers to provide docking services 3. Confirm the quotation、 sign a contract、 and arrange for sample testing 4. The laboratory receives samples and begins testing as needed 5. Complete the testing and issue a testing report 6. After sales service For detailed information about testing、 please contact the customer service of Baijian first、 and we will arrange for corresponding engineers to coordinate later. We welcome your consultation and look forward to working with third-party testing institutions of Baijian

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific、 fair、 and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered、 meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing、 with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle、 low cost、 and attentive service

7. Possess authoritative qualifications such as CMA、 CNAS、 CAL、 etc

8. The testing report is authoritative and effective、 and is generally used in China

tags:

Random recommendation...

13262752056 扫描微信