Electric hoist inspection

Material Analysis 百检检测 2024-07-12

JB/T 9008.2-2004#Steel wire rope electric hoists Part 2: Test methods # Electric hoists#

JB/T 9008.2-2004#Steel wire rope electric hoists Part 2: Test methods # Electric hoists # Paint film thickness

JB/T 9008.2-2004#Steel wire rope electric hoists Part 2: Test methods # Electric hoists # Insulation inspection

JB/T 9008.2-2004#Steel wire rope electric hoist Part 2: Test methods # Electric hoist # Grounding protection inspection

JB/T 9008.2-2004#Steel wire rope electric hoist Part 2: Test methods # Electric hoist # No-load test

JB/T 9008.2-2004#Steel wire rope electric hoists - Part 2: Test methods - Electric hoists - Determination of noise from lifting mechanisms

JB/T 9008.2-2004#Steel wire rope electric hoists Part 2: Test methods # Electric hoists # Static load test

JB/T 9008.2-2004#Steel wire rope electric hoists - Part 2: Test methods - Electric hoists - Determination of lifting and lowering speeds

JB/T 9008.2-2004#Steel wire rope electric hoists - Part 2: Test methods - Electric hoists - Determination of braking slip

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

BAIJIAN inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

tags:

Random recommendation...

13262752056 扫描微信