Level A Additional Requirements Test Detection

Material Analysis 百检检测 2024-10-31

GB 17498.7-2008#Fixed fitness equipment - Part 7: Special safety requirements and test methods for rowing machines - Rowing machines - Class A additional requirements - Testing

GB 17498.9-2008#Fixed fitness equipment - Part 9: Additional special safety requirements and test methods for elliptical training machines - Elliptical training machines - Level A additional requirements - Testing

GB 17498.8-2008#Fixed fitness equipment - Part 8: Additional special safety requirements and test methods for treadmills, step machines, and mountain climbers - Step machines, step machines, and mountain climbers - Level A additional requirements testing

BSEN 957-8:1998#Fixed training equipment - Part 8: Additional special safety requirements and test methods for treadmills, step machines, and mountaineering machines BSEN 957-8:1998 6.7 # Step machines, step machines, and mountaineering machines - Level A additional requirements and tests

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

BAIJIAN inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

tags:

Random recommendation...

13262752056 扫描微信