Elevator cable inspection

Material Analysis 百检检测 2024-03-04

General 1.1 General requirements. The test methods specified in each part of GB/T 5023 are listed in this part and the following standards: GB/T 291.1-2008 General Test Methods for Insulation and Sheath Materials of Electric and Optical Cables - Part 11: General Test Methods - Measurement of Thickness and Boundary Dimensions - Mechanical Performance Testing (IEC 60811-1-1:2000、 IDT) GB/T 50231-2008 PVC Insulated Cables with Rated Voltages of 450/750 V and Below - Part 1: General Requirements (IEC 60227-1:2007、 IDT) GB/T 18380.12-2008 Burning tests for cables and optical cables under flame conditions - Part 12: Vertical flame propagation test for single insulated wire and cable (IEC 60332-1-2.2004、 IDT) 1.2 Applicable tests for various types of cables are determined by product standards (GB/T 5023) 3. GB/T 5023.4、 etc.). 1.3 Classification of tests by frequency according to GB/T 5023.1- According to the definition in section 2.2 of 2008、 there are two types of tests: type test (symbol T) and/or sampling test (symbol S). The symbols T and s are used in the product standard (GB/T 5023) 3. GB/T 5023 4) in the relevant tables. 1.4 Sampling: If the insulation or sheath adopts embossed raised character markings、 the sampling should include this marking. Unless otherwise specified、 for multi-core cables、 except for 1 In addition to the tests specified in 9、 the sample taken should not exceed three cores (if color separation occurs、 different colors should be taken) for testing. All pre-treatment tests should be stored for at least 16 hours after the insulation or sheath is extruded before proceeding. 1.6 Test temperature Unless otherwise specified、 the test should be conducted at ambient temperature. 1.7 Test voltage Unless otherwise specified、 the test voltage should be an approximate sinusoidal waveform of AC 49 Hz~61 Hz、 with a ratio of peak to effective value equal to/2 (1+7%). All voltages are effective values. 1.8 Scrubbing resistance inspection of colors and markings should be carried out by gently wiping the manufacturer's name or trademark、 insulation wire core color、 or digital markings with a ball of absorbent cotton or a dry cloth soaked in water、 a total of 10 times. The inspection results should meet the standard requirements. 1.9 Insulation thickness measurement t1.9.1 step Insulation thickness should be in accordance with GB/T 2951.11-2008 section 8 According to the regulations、 cable samples should be taken at three locations at least 1 meter apart

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific、 fair、 and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered、 meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing、 with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle、 low cost、 and attentive service

7. Possess authoritative qualifications such as CMA、 CNAS、 CAL、 etc

8. The testing report is authoritative and effective、 and is generally used in China

tags:

Random recommendation...

13262752056 扫描微信