Metal corrugated pipe (15.3 anti leakage performance) testing

Material Analysis 百检检测 2023-12-12

Metal corrugated pipe inspection items: radial stiffness under concentrated load、 radial stiffness under uniformly distributed load、 deformation measurement、 anti leakage performance test after bearing concentrated load、 bending appearance and ruler anti leakage performance test inch inspection. Metal corrugated pipe testing method: Radial stiffness test under concentrated or uniformly distributed load: The sample length is taken as 5d、 and should not be less than 300mm. The minimum scale should not be less than 10N、 and the load should be applied at a speed not exceeding 20N/s. Anti leakage performance test under concentrated load: Apply concentrated load until the deformation reaches 20% of the inner diameter of the circular pipe or the short axis size of the flat pipe、 and fill the sample with pure water slurry with a water cement ratio of 0.5; If there is no seepage after filling with clean water、 no more water or mud can be added. Leakage resistance test after bending: Bend the metal corrugated pipe into an arc with a radius of 30 times the inner diameter of the circular pipe and no more than 800 times the diameter of the steel wire; The short axis direction of the flat tube is 4000mm. Appearance and size inspection: Use a vernier caliper for inner and outer diameter dimensions and ripple height、 use a spiral micrometer for steel strip thickness、 and use a steel tape measure for length

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific、 fair、 and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered、 meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing、 with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle、 low cost、 and attentive service

7. Possess authoritative qualifications such as CMA、 CNAS、 CAL、 etc

8. The testing report is authoritative and effective、 and is generally used in China

tags:

Random recommendation...

13262752056 扫描微信