A thermal insulation system is placed on the outer side of the building's exterior wall and fixed to the base wall using adhesive as the main method and anchor as the auxiliary method. The system is composed of hard foam polyurethane board、 adhesive、 anchor bolts、 3mm to 5mm thick plastering adhesive、 glass fiber mesh、 and decorative materials. The system also includes necessary corner protectors、 brackets、 and other accessories、 as well as fire-resistant construction measures、 abbreviated as the hard foam polyurethane board external insulation system p>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific、 fair、 and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsinspection and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered、 meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing、 with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle、 low cost、 and attentive service 7. Possess authoritative qualifications such as CMA、 CNAS、 CAL、 etc 8. The testing report is authoritative and effective、 and is generally used in China