Energy efficiency testing for civil building engineering 260302 testing

Standards 百检检测 2023-12-05

Building energy-saving engineering specifically refers to the implementation of energy-saving standards in the planning、 design、 construction (renovation、 expansion)、 renovation、 and use of buildings、 the use of energy-saving technologies、 processes、 equipment、 materials、 and products、 the improvement of insulation performance and the efficiency of heating、 air conditioning、 refrigeration、 and heating systems、 the strengthening of the operation and management of building energy systems、 the utilization of renewable energy、 and the guarantee of indoor thermal environment quality、 Reduce energy consumption for heating、 air conditioning、 refrigeration、 lighting、 and hot water supply. The civil buildings referred to in these Measures refer to residential buildings and public buildings. Those engaged in the construction、 renovation、 expansion and other related activities of civil construction projects within the territory of the People's Republic of China、 as well as the supervision and management of the quality of civil construction projects、 must comply with these measures

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific、 fair、 and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered、 meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing、 with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle、 low cost、 and attentive service

7. Possess authoritative qualifications such as CMA、 CNAS、 CAL、 etc

8. The testing report is authoritative and effective、 and is generally used in China

tags:

Random recommendation...

13262752056 扫描微信